Skip to content

Return to Projects

Thameslink Core Resignalling Programme

Rail Signalling Testing & Commissioning
Contact Our Team Today

The challenge

The Thameslink core between St Pancras and Blackfriars carries one of the most intensive timetables in Europe. Our team was engaged to renew life-expired signalling equipment and prepare the route for full in-cab signalling, all while the railway continued to run a 24-trains-per-hour peak service.

Working within short midweek-night possessions, we staged the renewal so that every piece of legacy equipment had a tested, commissioned replacement before it was recovered. Correlation, testing and entry into service were managed by our in-house commissioning team.

The outcome

The programme was handed back on schedule with no service-affecting overruns, and the route now operates with a fully renewed, remotely monitored signalling asset base.